What happened in Pulaski
This job started as a water emergency on April 14, 2026, and the crew logged 270 photos over the following weeks. The photos here are from May 11.
The affected rooms have sheet vinyl flooring and paneled and painted walls. The baseboards are off, and blue drying mats run tight along the bottom of the walls in the hallway and the main room, where the wall base and the edge of the floor took on water. One section of the floor covering was pulled back to expose the wood subfloor underneath.
The main room was still in use, with furniture and belongings in place, so the drying was set up around them.
Work performed
- Water emergency response
- Baseboards removed
- Drying mats along the base of the walls
- Floor covering pulled back to check the subfloor