What happened in Pulaski
This Pulaski job was a water emergency opened on April 10, 2026. The crew logged 87 photos, and the ones here are from April 14 and 15.
The affected area includes a bathroom with a vanity and toilet and a room with a dark tile floor. Air movers were set right inside the bathroom, and a dehumidifier ran in the next room, where part of the flooring had been taken up. At the base of one wall the drywall was cut away to let the cavity dry.
Most of the photos are readings: pinless meter checks on the tile and along the walls, and thermo-hygrometer readings at the dehumidifier and at the sink to track the humidity in the rooms.
Work performed
- Water emergency response
- Air movers in the bathroom and dehumidifier in the next room
- Drywall cut at the base of one wall
- Moisture and humidity readings over two days