What happened in Neenah
CCS responded to this commercial water loss at a warehouse in Neenah. The project was opened on August 12, 2025, and has 131 photos. The set here is from August 18.
The building has a large concrete floor marked with yellow and blue safety lines, with pallets of stacked product along the aisles and racking down the length of the space. A crew member worked through the aisles with a pump sprayer and wand, treating the concrete floor, the base of the walls and the guard rails where the water had run.
The photos follow the treatment aisle by aisle, along the walls behind the racking and into the loading and work areas near the doors. In a warehouse, water that spreads under pallets and along wall bases can leave residue and odor behind, so treating the floor after the water is removed is part of getting the space back to normal operation.
Work performed
- Commercial water emergency response
- Floor treatment with a pump sprayer
- Wall bases and guard rails treated
- Aisles and work areas covered