What happened in Green Bay
CCS opened this water damage and repair job in Green Bay on August 1, 2025. It ran for months and has 310 photos. The photos here are from December 2025 and May 2026.
The December photo shows new dark storage cabinets installed along a wall. The May 13 set is a walkthrough of the basement. Much of it is open framing, with wood studs, door frames and a few sections of wall paneling stacked or leaning against the studs. Storage shelving lines several walls.
The ceiling is open, showing the ductwork, the white drain pipes and the supply lines running along the joists, and the photos follow them from the utility area to the stairway. A walkthrough like this records the condition of the framing, the mechanicals and the storage areas so the next stage of repairs can be planned room by room.
Work performed
- Water emergency response
- Basement framing and door openings documented
- Open ceiling and mechanicals checked
- Storage cabinets installed