What happened in Neenah
This Neenah job started as a water emergency in a finished basement on September 21, 2026. The crew logged 72 photos, and the ones here are from October 1, ten days later.
The basement has wood-look plank flooring through a family room with a fireplace wall, a game room with a pool table, a bedroom, a bathroom and an unfinished storage side. These photos walk through every room with the furniture in place, and the last three are meter readings on the flooring and the wall base, with the pin meter reading 0.0.
A dry reading at the end of the job is what lets the crew sign off and pull the equipment.
Work performed
- Water emergency response and drying
- Final walkthrough of every room
- Final moisture readings on the flooring and walls