What happened in Hortonville
This Hortonville basement was a water emergency, and the crew opened the job and did the cleanup on the same day, August 24, 2026, logging 81 photos.
The basement is partly finished, with framed walls, rigid foam insulation along part of the foundation and a concrete floor throughout. The photos show the crew at work: pulling wet foam board and materials off the wall base, vacuuming water off the floor with a wet vac, scrubbing and mopping the concrete, and clearing debris. A thermo-hygrometer reading records the humidity during the cleanup.
By the last shots the floor has been cleaned and the wall bases are open to dry.
Work performed
- Same-day water emergency response
- Wet foam board and materials removed from the wall base
- Water extracted from the concrete with a wet vac
- Floor scrubbed and mopped
- Humidity reading
Photos labeled Before and After were taken by the CCS crew on this job.



