What happened in Hortonville
This Hortonville basement was a water emergency opened on September 10, 2026. The crew logged 51 photos, and the ones here were taken on September 11 and October 1.
The finished basement has wood wainscoting on the lower walls and painted drywall above. On the first day the carpet was already out, and air movers and a dehumidifier were running on the bare concrete. A section of wall under the stairs was opened to the studs. The crew took a thermo-hygrometer reading and moisture readings at the bottom plates.
The October photos show the crew measuring the opened walls with a laser distance meter for the repair estimate.
Work performed
- Water emergency response
- Carpet removed
- Air movers and dehumidifier on the concrete
- Wall under the stairs opened to the studs
- Moisture readings and laser measurements for repairs