What happened in Suring
This Suring job was a water emergency opened on July 15, 2026. The crew logged 204 photos, and the ones here are from July 17 and September 11.
The house is finished in knotty pine paneling with wood trim and doors. The flooring had been taken up to bare concrete, and the baseboards were removed along the paneling. The photos walk through the hallways, the main room and the stairway.
The contents were moved out of the way into a portable storage container on the property. The last two photos show the container loaded with furniture and belongings, and later standing empty.
Work performed
- Water emergency response
- Flooring removed to the concrete
- Baseboards removed along the paneling
- Contents moved into a portable storage container