What happened in Appleton
This Appleton job was approved as private work in August 2026. The crew logged 52 photos across four visits between August 7 and August 18.
The room has wood plank flooring and painted shiplap walls, and low-angle shots across the floor show the boards no longer lying flat. The crew measured the room with a laser distance meter, took the baseboards off to expose the edge of the flooring and subfloor along the walls, and took moisture readings there. A dehumidifier ran in the room, and thermo-hygrometer readings track the humidity from one visit to the next.
Wood floors can sometimes be dried in place when the moisture is caught early and tracked closely.
Work performed
- Laser measurements of the room
- Baseboards removed along the floor edge
- Moisture readings at the flooring and subfloor
- Dehumidifier drying with humidity tracked over four visits



