What happened in Amberg
CCS opened this water damage job in Amberg on July 3, 2025, and has 56 photos on file. The most recent set, shown here, was taken on July 1, 2026.
The work centers on an upstairs room built under the roofline, with sloped ceilings and short knee walls. New wood-look plank flooring was going down across the room. In some spots it was finished, and in others the OSB subfloor was still bare where the old flooring had come up. The knee wall access openings were open, and the insulation behind one sloped wall had been pulled loose.
The photos follow the room from end to end, including the corners by the knee walls and the floor hatches that open into the space below the eaves. Under-roof rooms like this can collect water from a roof or window leak, and the low corners are where it soaks into the floor first.
Work performed
- Water emergency response
- Old flooring removed to the subfloor
- New plank flooring installed
- Knee wall spaces opened and checked



