What happened in Redgranite
This Redgranite job was approved for mold remediation in August 2026. The crew documented the first visit with 83 photos on August 18.
The building is older, with wallpapered walls, wood trim and floors, and a front room lined with shelving full of stored items. Several ceilings show staining and damage, and one bare wood floor has dark staining spread across it. Most of these photos show a crew member measuring each room with a laser distance meter, recording wall lengths and ceiling heights to scope the remediation.
Measuring every room on the first visit is how the crew builds an accurate plan and price before any work starts.
Work performed
- Walkthrough of every room
- Laser measurements of walls and ceiling heights
- Inspection of stained ceilings and floors
- Mold remediation scope