What happened in Neenah
This Neenah basement was approved for mold remediation, and the crew documented the work with 19 photos on July 29, 2026.
The finished basement has carpet, painted walls and a wood plank ceiling. The crew laid drop cloths over the carpet and set their tools and equipment in one corner, then removed sections of the ceiling boards along a soffit by the windows to open up the space above. The last photos show a crew member treating the exposed framing in the ceiling with a spray wand.
Covering the carpet first keeps debris and treatment off the flooring that stays in place.
Work performed
- Drop cloths laid over the carpet
- Ceiling boards removed along the soffit
- Treatment of the exposed ceiling framing



