What happened in Sheboygan
This Sheboygan basement was approved for mold remediation at the end of August 2026. The crew logged 45 photos on the job, and the ones here are from September 24.
The basement is unfinished, with painted walls, open joists and a concrete floor, and it had been cleared out except for a workbench and a few pieces of equipment. The photos cover the full length of the space, and one shows the room being fogged with a treatment that hangs in the air between the joists.
Some sections of the floor look dark and freshly wet, while others show lighter, bare concrete.
Work performed
- Basement cleared for the work
- Mold remediation of the basement
- Fogging treatment of the space