What happened in Howard
This Howard basement was approved for mold remediation in May 2026, and the crew documented it with 47 photos on May 19.
The basement is unfinished, with painted block walls, open joists and a lot of stored belongings. The first photos show the space before the work, with shelving, boxes and furniture throughout. The crew then wrapped the furniture and stored items in plastic sheeting and moved them toward the middle of the room, away from the walls.
With the contents covered, a crew member treated the foundation walls with a sprayer, working around the water heater and the utility area too.
Work performed
- Furniture and stored items wrapped in plastic
- Contents moved away from the walls
- Treatment of the foundation walls
- Work around the water heater and utility area