What happened in Mishicot
This Mishicot job was approved for mold remediation in a commercial building at the end of May 2026. The crew logged 224 photos, and the ones here are from May 27, the day the job was opened.
The building has carpeted rooms and hallways under wood plank ceilings, public restrooms, and a large open area with a concrete floor and an overhead door. Several photos show a camera on a tripod set up in the hallway and the open area to record the spaces.
Walking and photographing every room at the start gives the crew and the owner a complete picture of the building before the remediation work.
Work performed
- Walkthrough of every room in the building
- Camera documentation of the hallway and open area
- Mold remediation