This Hobart basement was approved for mold remediation in early May 2026. The crew documented the work with 43 photos taken on May 7 and May 14.
The carpet in the finished basement had been pulled up, leaving bare concrete with pad and adhesive marks through the family room, the hallway and the side rooms. The crew worked along the base of the walls by hand, wiping down the baseboards and the bottom of the drywall, and ran a vacuum across the floor.
Photos from both visits cover every room, so the condition of the floor and walls is on record through the job.
Work performed
- Carpet removed from the finished basement
- Baseboards and wall bases wiped down by hand
- Floor vacuumed
- Photo record on two visits