What happened in Green Bay
This Green Bay job was approved for mold remediation in August 2026. The crew logged 99 photos, and the ones here are from October 27 and 28.
The work was in a back entry, a hallway and a stairwell. The ceiling had been removed down to the joists and the subfloor of the floor above, and the upper sections of the stairwell walls were opened to the framing. A crew member worked down the stairs with a vacuum hose, cleaning the exposed wood and the stair treads.
The lower walls stayed in place, and the photos follow the open framing from the entry door up the full height of the stairwell.
Work performed
- Ceiling removed to the joists
- Upper stairwell walls opened to the framing
- Exposed wood and stairs vacuumed
- Mold remediation in the stairwell