What happened in De Pere
This De Pere basement was approved for mold remediation in August 2026. The crew logged 125 photos, and the ones here are from August 26.
The work focused on the basement ceiling and the top of the foundation walls: the OSB subfloor, the floor joists, and the rim joists along the perimeter, which are packed with insulation. Ductwork and plumbing lines run through the joist bays. The crew photographed the full perimeter of the basement bay by bay, from the window wall around to the storage corner with the pegboard.
Rim joists are a common spot for basement mold because warm indoor air meets the cold outside wall there.
Work performed
- Inspection of the subfloor, joists and rim joists
- Bay by bay photo record of the basement perimeter
- Mold remediation of the basement ceiling framing