What happened in Baird Creek Parkway
CCS opened this mold remediation job in the Baird Creek Parkway area of Green Bay on February 20, 2025, and logged 113 photos. The photos here are from March 27.
One photo was taken by flashlight in the attic, looking across the roof framing and the loose blown-in insulation on the attic floor. The rest of that day was spent documenting the primary bathroom: a freestanding soaking tub in front of a stone accent wall, a separate toilet room, a wall-hung vanity with under-cabinet lighting, a sliding barn door and the tile floor.
The bathroom photos go wall by wall and include the ceiling and the corners, so the condition of every surface is on record when the job closes. Bathrooms and the attic space around them are common places to check on a mold job, since they hold the most moisture in the house.
Work performed
- Mold remediation
- Attic framing and insulation checked
- Bathroom documented wall by wall



