What happened in Hobart
CCS opened this mold remediation and build-back job in Hobart on August 12, 2025, and logged 47 photos. The photos here are from the build-back stage on September 23 and October 2.
By late September the rooms had fresh paint on the walls and ceilings. The photos go corner to corner in each room, looking up at the ceilings around the fans and down at the walls along the carpet, which is how the crew checks a finish before calling it done. A side entry with a glass panel door and a large window was painted a warm yellow.
On October 2 the last trim was going in. Lengths of baseboard lay on the carpet, ready to be fitted along the bottom of the walls. Paint and trim are the final steps once the mold work is complete.
Work performed
- Mold remediation
- Walls and ceilings repainted
- Baseboard trim reinstalled
- Final walkthrough photos