What happened in Fish Creek
This basement near Fish Creek was approved for mold remediation in September 2026. The crew logged 32 photos, and the ones here are from September 27.
The finished walls in the main room had been torn out down to the wood studs and the board backing behind them, leaving the concrete floor stained where the old flooring and wall bases had been. Debris was bagged and carried out. The utility side of the basement holds the water softener, a pressure tank and the laundry, and the crew photographed those areas too.
Taking the walls down to the framing gives the crew direct access to every surface that needs to be cleaned and treated.
Work performed
- Finished walls torn out to the studs
- Debris bagged and removed
- Utility and laundry areas inspected
- Mold remediation of the exposed framing