What happened in Sturgeon Bay
This Sturgeon Bay basement was approved for mold remediation in October 2026. The crew logged 209 photos over the job, and the ones here are from November 3.
The basement had been gutted. The finished walls were down to the studs, with rigid foam insulation left against the foundation in places, the ceiling was open to the joists, and the floor was stripped to concrete in the main rooms and to the old wood flooring in the bathroom area. Air movers were still running in each room.
The last photo shows air movers and supplies loaded in the work van.
Work performed
- Finished walls removed to the studs
- Ceiling opened to the joists
- Flooring removed
- Air movers run through each room
- Mold remediation of the exposed framing