What happened in Allouez
CCS opened this mold remediation job in Allouez on November 15, 2024, and documented it with 72 photos. The photos here are from November 25 and 26.
On November 25 a crew member treated the floor and the lower walls with a pump sprayer in a room with a parquet-pattern floor, working around the built-in cabinets and under a window.
On November 26 the photos move to the basement, which is finished in knotty pine paneling with a drop ceiling. The carpet had been taken out, leaving the concrete bare with patches of old pad and adhesive, including on the stairs. Plastic sheeting was hung inside the closets and the storage areas off the main room to contain the work, and the photos go down the long hallway and into each closet. Paneled basements from this era often have mold hiding behind the wood and under the carpet, so both come up for a proper look.
Work performed
- Mold remediation
- Spray treatment of floors and lower walls
- Basement carpet removed
- Closets and storage areas sealed with plastic



