What happened in Allouez
This Allouez attic was approved for mold remediation, and the crew documented the job with 26 photos on April 23, 2026.
The underside of the roof deck had heavy dark mold growth across the board sheathing between the rafters, from the peak down toward the eaves. The crew photographed each bay to record how far it had spread before the remediation.
The house was empty at the time. The last photos show the hardwood floors in the hallway and bedrooms and the carpeted stairway.
Work performed
- Inspection of the roof sheathing bay by bay
- Mold remediation in the attic



