What happened in Little Chute
This Little Chute job began as a water emergency in a finished basement on September 9, 2026. The crew logged 132 photos, and the ones here are from October 13 and 22.
The first two photos show the basement during the work, with the floor bare and drying equipment in place. The rest show the basement finished: gray carpet installed wall to wall through the family room, the hallway and the side rooms, white baseboards back on, and the sliding barn door closets in place.
Fresh vacuum lines in the carpet show the rooms were cleaned before the crew wrapped up.
Work performed
- Water emergency response and drying
- Carpet installed through the basement
- Baseboards reinstalled
- Final cleaning