What happened in Kiel
CCS took this Kiel job from a water emergency in January 2026 through the build-back. The crew logged 100 photos over the course of the job.
The first photo shows a moisture reading taken over the exposed floor during drying. The rest show the space after the rebuild, with photos dated through March 18. Wood-look plank flooring now runs through the hallway, the main room and the utility room, and one shot shows a box of the plank flooring before it went down.
The utility room holds the water heater, water softener, pressure tanks and plumbing, and the crew photographed the finished floor around each of them.
Work performed
- Water emergency response and drying
- Moisture readings during drying
- New plank flooring installed in the affected rooms