What happened in Howard
This Howard job started as a water emergency in a finished basement in January 2026. The crew documented it with 222 photos.
The photos here were taken on January 15 and 16. The carpet has already come out, leaving bare concrete across the family room, and the baseboards have been pulled and stacked along one wall so the bottom of the drywall can dry. The furniture sits along the walls, off the cleared floor.
The last few shots show the unfinished storage and utility side of the same basement.
Work performed
- Water emergency response
- Wet carpet and pad removed
- Baseboards pulled so the wall bottoms could dry



