What happened in Wilder Park
This job in the Wilder Park area of Green Bay combined roof repairs, a water emergency and build-back. The project was opened on March 19, 2024, and grew to 372 photos. The set here is from late May and June 10, 2024.
The May 30 photos are close-ups of the new carpet where it meets the walls and the stair edges, checked as the flooring went in. By June 10 the inside was finished. New carpet runs up the main stairway and down the stairs to the lower level, and the family room has new carpet wall to wall. The bathrooms have new flooring, and one has a new white vanity with a dark countertop, a framed mirror and new lights.
The photos walk the house from the top of the stairs down, so each finished area is on record. A roof leak that lets water into the house often damages ceilings, walls and floors on more than one level, so the rebuild touches several rooms.
Work performed
- Roof repairs
- Water emergency response
- New carpet on the stairs and in the family room
- Bathroom flooring and vanity replaced