What happened in Green Bay
CCS handled this commercial water damage and build-back job in Green Bay. The project was opened on December 14, 2024, and is one of the larger ones on file at 602 photos. The photos here are from the cabinetry stage in May and July 2025.
On May 8 the crew measured the wood veneer cabinet doors in a meeting room, one by one. Tape measures were laid across the width and height of each door, at the hinge cutouts and along the cabinet openings, so replacement doors could be ordered to match. Several doors had already been taken off and stood against the cabinets.
On May 19 the new doors were hung on the credenza under the white countertop, and one was opened to show the shelves inside. A final photo from July 10 shows the finished cabinets. In commercial spaces, water often damages the lower cabinets first, and matching the veneer and hardware is what makes the repair disappear.
Work performed
- Commercial water emergency response
- Cabinet doors measured for replacement
- New cabinet doors installed
- Final check of the finished cabinetry