What happened in De Pere
This De Pere job was a water emergency opened on April 4, 2026. The crew logged 241 photos on it, and the ones here are from April 14 through 17.
An air mover and a dehumidifier were running in the affected rooms. Most of the photos are close shots of meter screens. The crew checked the air with a thermo-hygrometer and checked wood trim, drywall and subfloor with pin and pinless moisture meters, photographing each reading so the numbers are on record. One photo shows a section of drywall cut open at the base of a wall.
Readings like these show when the structure is dry enough for repairs to start.
Work performed
- Water emergency response
- Air mover and dehumidifier drying
- Humidity readings with a thermo-hygrometer
- Pin and pinless moisture readings on trim, drywall and subfloor