What happened in Tigerton
CCS opened this mold remediation job in Tigerton on October 22, 2025, and documented it with 52 photos. The photos here are from November 4 and November 25.
On November 4 the crew walked the basement, which has block foundation walls, some framed and paneled sections, the water heater and utility equipment, and stored lumber and pipe along one wall. A spray wand was used along the block on that visit.
On November 25 the work moved overhead. The photos look up at the wood subfloor boards, the floor joists and the beams, which are held up in places by steel adjustable posts. A crew member treated the ceiling bay by bay with a pump sprayer and wand, working around the posts, the wiring and the water lines. Older basements often have board subfloors and joists that have been damp for years, so the whole ceiling is treated, not just the stained spots.
Work performed
- Mold remediation
- Basement walk-through and wall treatment
- Ceiling joists and subfloor treated
- Work around posts, wiring and pipes