What happened in Bowler
CCS opened this mold remediation job near Bowler on December 24, 2025, and documented it with 121 photos. The set here is from January 13, 2026.
The house was empty. The floor covering had been removed through the bedrooms, the long hallways and the main living area, leaving the underlayment bare with light patches and residue where the old flooring had been attached. The baseboards and door trim were still on, and the walls were intact.
The crew photographed each room from the doorway and each hallway end to end, so the condition of the whole floor was on record after the removal. Taking up flooring across an entire level is common on mold jobs where moisture has been trapped under carpet or vinyl, since the growth tends to spread along the underside where it cannot be seen.
Work performed
- Mold remediation
- Flooring removed through the house
- Rooms and hallways documented