What happened in Seymour
CCS opened this mold remediation job near Seymour on June 27, 2025, and documented it with 47 photos. The set here is from October 14.
The basement is a long, older space with painted block and concrete walls, an open wood ceiling, a stairway, the furnace and water tanks, and a home gym area with rubber floor tiles and storage racks. A crew member treated the basement with a spray wand, working along the bottom of the walls, under the stairs and across the concrete floor, which was wet and shiny in the photos as the treatment went down.
The walls showed dark staining and flaking paint along the base, and the crew worked around the stored equipment and the rubber floor tiles to reach them. Treating the whole floor and the lower walls of an older basement deals with the growth that builds up where the block stays damp near the ground.
Work performed
- Mold remediation
- Spray treatment of the floor and lower walls
- Stairway and utility areas treated



