What happened in New London
CCS handled this basement mold remediation job in New London. The project was opened on August 15, 2024, and has 73 photos, all from that day.
The basement has a long room finished in pine paneling with a vinyl tile floor, and a bathroom with green painted walls. Blue air movers were set along the paneled walls. In the bathroom and the next room, the lower drywall had been cut away, exposing the studs, the bottom plates and the insulation in the outside walls.
A crew member took moisture readings on the bottom plates, at the base of the paneling, along the cut edges of the drywall and on the floor, with the meter showing low numbers in several spots. Readings like these tell the crew whether the framing is dry enough to treat and close up, or needs more time with the equipment running.
Work performed
- Mold remediation
- Lower drywall cut away in the bathroom
- Air movers along the paneled walls
- Moisture readings on plates, paneling and drywall