What happened in Little Suamico
CCS opened this mold remediation job in Little Suamico on December 4, 2024, and documented it with 31 photos from December 4 and December 18.
On the first visit the flooring had been taken up through the main rooms, exposing the wood subfloor, and the bottom of the walls had been cut away. A crew member treated the subfloor and the open wall bases with a pump sprayer and wand while a dehumidifier and an air mover ran nearby.
By December 18 the work had gone further. The wall behind the tub was opened to show the plumbing valves and supply lines, a section of the subfloor was cut out to expose the ductwork running underneath, and an outside wall was opened to the pink insulation. When moisture has been under a floor for a while, it often spreads to the plumbing walls and the space below the floor, so those areas are opened and checked too.
Work performed
- Mold remediation
- Flooring removed to the subfloor
- Lower walls cut and treated
- Plumbing wall and subfloor opened for inspection