What happened in Luxemburg
CCS opened this mold remediation and build-back job in Luxemburg on January 8, 2025, and documented it with 48 photos through mid-February.
The work was in a basement with wood-paneled walls and an open ceiling. On the first day the crew set up a dehumidifier and ran cords and hoses through the room. Two days later they photographed the top of the foundation wall up close, where the rim joist and sill plate showed pale growth and staining on the wood.
By February 12 the photos move to the utility wall, where the covers were off the electrical panels and the wiring was exposed. Basement walls that touch the foundation tend to stay damp, and the rim joist area is one of the first places mold shows up when they do.
Work performed
- Mold remediation
- Dehumidifier set up in the basement
- Inspection of the rim joist and sill plate
- Build-back