What happened in Kaukauna
This Kaukauna basement was approved for mold remediation in January 2026, and the crew logged 142 photos on the job. The photos here are from March 20 and 23.
By this stage the affected materials had been torn out. The ceiling is open to the floor joists, the walls are down to bare framing and foundation in places, and the concrete floor has been cleared. Vacuums and air equipment are set up around the space while the work goes on.
Opening the basement up this far lets the crew clean and treat the framing directly instead of covering over mold that is still there.
Work performed
- Removal of affected ceiling and wall materials
- Framing and joists exposed for cleaning
- Air equipment and vacuums run during the work
- Basement floor cleared