What happened in Hobart
This Hobart attic was approved for mold remediation at the end of September 2026. The crew documented it with 13 photos on October 5.
The attic is framed with wood trusses under plywood roof sheathing, with blown-in insulation on the floor and a boxed wood enclosure built up from the ceiling. The photos work around the trusses and webs bay by bay, with close shots where the lower framing meets the insulation.
Photos taken bay by bay give a clear record of the roof deck and framing at the time of the work.
Work performed
- Inspection of the trusses and roof sheathing
- Bay by bay photo record of the attic
- Mold remediation in the attic



