What happened in Western Corridor
This basement in Green Bay's Western Corridor neighborhood was approved for mold remediation in early July 2026. The crew documented it with 24 photos taken between July 6 and July 9.
It is an older basement with painted block walls, a dark painted joist ceiling and a concrete floor that is stained darker along the walls. The crew treated the walls with a spray wand, including the base of the block, the corners and the window well opening, and photographed every wall during the work. The stairway and the block wall beside it show the same staining.
Work performed
- Treatment of the block walls with a spray wand
- Treatment at the corners and window well
- Photo record of every wall