What happened in Green Bay
This Green Bay basement was approved for mold remediation in late July 2026. The crew logged 64 photos, and the ones here are from September 10 and 15.
The basement is a large open space with poured concrete walls, open joists and a concrete floor, cleared out except for a workbench. White and dark growth had built up in several of the wall corners and along seams in the concrete. The crew worked the corners and the lower walls with a spray wand, and the wide shots show the full basement during the treatment.
The first two photos show a tape measure on a stained piece of drywall beside the stairs, recording how far up the damage went.
Work performed
- Measurement of the stained drywall by the stairs
- Treatment of the wall corners and seams
- Treatment of the lower concrete walls