What happened in Historic Central
This Appleton basement, in the Historic Central neighborhood, was approved for mold remediation. The crew documented the job with 28 photos on July 17, 2026, the day after it was opened.
The basement has painted concrete block walls and a concrete floor, with storage shelving, a workbench and a laundry area along the walls. Brown and dark staining ran along the mortar joints and down the lower block on several walls, and the floor along those walls was darker than the rest. The crew photographed each wall section, including the corners behind the shelving and around the plumbing.
Work performed
- Inspection of each basement wall section
- Photo record behind shelving and around plumbing
- Mold remediation of the block walls