What happened in Green Bay
This Green Bay job was approved for mold remediation, and the crew documented the work with 9 photos on October 30, 2026, the day it was opened.
In a room with wood-look plank flooring, the drywall below a window was cut out, exposing the framing and the back of the wall, and the debris was cleaned up with a vacuum. An air scrubber set on plastic sheeting ran in the room to filter the air during the work.
In the basement, the crew also treated the block foundation wall and the joists overhead with a spray wand.
Work performed
- Drywall below the window cut out
- Debris vacuumed
- Air scrubber run during the work
- Basement block wall and joists treated