What happened in Green Bay
This Green Bay attic was approved for mold remediation in April 2026. The crew documented the job with 19 photos taken on April 22 and May 4.
The roof deck is OSB over wood rafters, and much of the underside shows dark mold staining, heaviest in the bays toward the eaves. Pink fiberglass insulation covers the attic floor, and a flexible exhaust duct runs through one section. The crew worked bay by bay from the attic access, and one photo shows a spray wand in use on the sheathing.
The May 4 photos give a second look at the same areas later in the job.
Work performed
- Inspection of the attic roof deck
- Treatment of the sheathing with a spray wand
- Follow-up photos later in the job