What happened in Hobart
This Hobart basement was approved for mold remediation at the end of April 2026, and the crew documented the work with 27 photos on May 4.
The basement is unfinished, with poured concrete walls, a concrete floor and open floor joists overhead. The foundation walls had dark mold staining in streaks and patches. A crew member in orange gloves worked through the space with a spray wand, treating the concrete walls, the floor along the walls, and the joists and subfloor above.
Stored belongings and furniture were covered with sheets and plastic first so the treatment would not land on them.
Work performed
- Belongings covered before treatment
- Treatment of the foundation walls
- Treatment of the floor joists and subfloor
- Mold remediation across the basement



