What happened in Howard
CCS visited this Howard basement on April 7, 2026, to estimate repair work, and documented the visit with 22 photos. The owner received a written bid for the job.
The finished basement had already been opened up after water got in. The drywall was cut out along the bottom of the walls in the family room, leaving the studs exposed, and the carpet had been pulled from part of the floor. The crew walked every room, including a craft and office room, the stairway and a bookshelf area, to record what would need to be rebuilt.
A full photo walkthrough lets the estimate cover drywall, trim and flooring room by room.
Work performed
- Walkthrough of the finished basement
- Photo record of opened walls and flooring
- Written repair bid