What happened in Green Bay
This Green Bay repair job was approved as private work and finished in October 2026. The crew logged 72 photos, and the ones here are from October 12 and 13.
The old surface on a balcony deck had broken down, and the photos show the deteriorated boards and debris before the work. The crew tore it out, put down new sheathing and covered the deck with a black rubber roofing membrane, turned up against the wall and around the door. A rubber membrane is a common choice for a deck that has to keep water out of the structure below it.
The first photos show ceilings inside the home.
Work performed
- Old deck surface torn out
- New sheathing installed
- Rubber membrane laid over the deck
- Membrane turned up at the wall and door
Photos labeled Before and After were taken by the CCS crew on this job.



