What happened in Green Bay
CCS visited this home in Green Bay for a private repair estimate. The project was opened on October 28, 2025, and has 73 photos. The set here is from December 15, and the owner received a written estimate for the work.
The kitchen has cherry-finish cabinets, dark countertops, a gas range and an over-the-range microwave. Along the counters the backsplash had come off, leaving the wall behind it torn down to the brown drywall paper and patches of old adhesive, from the sink window to the range. In one corner the upper cabinets were out, showing the painted wall and the open space where they had hung.
The crew photographed the kitchen from the doorway and each run of counter up close, along with the bathroom sink and faucet. Detailed photos of the wall, the cabinets and the counters let the estimate cover the wall repair, the new backsplash and resetting the cabinets.
Work performed
- Kitchen documented for a repair estimate
- Damaged backsplash wall checked
- Cabinet openings measured and photographed
- Written repair estimate



