What happened in Coleman
CCS handled this repair job at a gymnasium in Coleman. The project was opened on April 23, 2024, and the 5 photos were taken that day.
The gym has a curved ceiling carried on large arched wood beams, light-colored ceiling panels between them, a hardwood court and blue padding on the end walls. The photos look up at the ceiling and along the upper side walls, where several panels were damaged, with holes punched through and dents and scuffs across the surface near the lights and the wall-mounted equipment.
The last photos show the full length of the gym from each end, so the location of each damaged panel is on record against the beams and the court lines. In a gym, ceiling and upper wall panels take hits from balls and equipment over the years, and replacing the damaged ones keeps the room looking finished and safe.
Work performed
- Damaged ceiling and wall panels documented
- Panel locations recorded against the beams
- Repairs to the damaged panels