What happened in Allouez
CCS took on this private repair and build-back job in Allouez in March 2024 and documented it with 94 photos. The set here is from April 3.
The work was new flooring across the main floor. Gray wood-look plank flooring was going down in the front room, the living room, the entry by the stairway and the hallway. Several photos show it in progress, with rows of new plank running up to a section of bare OSB subfloor along a wall and in a hallway, where the last pieces still had to be fitted.
The crew also photographed a closet and the space under the stairs, where the OSB was exposed and the opening was framed in white trim. Running one floor through the main level ties the rooms together, and the transitions at the stairs, the doorways and the closets are where the fitting takes the most care.
Work performed
- New wood-look plank flooring through the main floor
- Subfloor prepped for the final rows
- Flooring fitted at the stairway and doorways