What happened in Highland Beach
This water emergency in the Highland Beach area of Sherwood was opened on March 24, 2026. The crew logged 187 photos on the job, and the ones shown here are from March 30 and 31.
By then the lower drywall had been cut away in the affected rooms, leaving the studs open along the floor, and the flooring was gone down to the subfloor. The crew checked conditions with a thermo-hygrometer at the dehumidifier and took moisture readings at the base of each wall.
A crew member also went along the open walls with a pump sprayer, applying an antimicrobial treatment to the exposed framing.
Work performed
- Water emergency response
- Flood cuts along the lower drywall
- Flooring removed to the subfloor
- Humidity and moisture readings during drying
- Antimicrobial treatment on the exposed framing



